1. Shipment
2. Inspection
3. Backup
4. Delay
5. Quality
A plan used if the first one fails
How good or bad something is
Careful check to find problems
When something happens later than planned
Goods sent from one place to another
Drag the cards on the right so each lines up with the correct item on the left.