Vocabulary Flashcards and Quiz of Project Updates and Solution Proposal During Peak Hours – English for Mechanical Engineer – Advanced Level

Peak hours
The busiest time of the day.
Overheating
Getting too hot to work well.
Cooling system
A device that lowers temperature.
Production rate
The speed at which products are made.
Install
To set up or put in place.

Click a card to flip it and reveal the meaning.

2. Match the words with their meanings
Peak hours
Overheating
Cooling system
Production rate
Install
The busiest time of the day.
A device that lowers temperature.
The speed at which products are made.
To set up or put in place.
Getting too hot to work well.

Drag the cards on the right so each lines up with the correct item on the left.

3. What does “Peak hours” mean?
4. What does “Overheating” mean?
5. What does “Cooling system” mean?
6. What does “Production rate” mean?
7. What does “Install” mean?

Practice more with this lesson: