Vocabulary Flashcards and Quiz of Following Up and Handling Objections in Mechanical Engineering โ€“ English for Mechanical Engineer โ€“ Medium Level

Design
A plan or drawing of something to be made.
Assembly
The process of putting parts together.
Deadline
The time by which something must be done.
Material
The substance from which something is made.
Update
To make something more modern or correct.

Click a card to flip it and reveal the meaning.

2. Match the words with their meanings
Design
Assembly
Deadline
Material
Update
The time by which something must be done.
To make something more modern or correct.
The process of putting parts together.
The substance from which something is made.
A plan or drawing of something to be made.

Drag the cards on the right so each lines up with the correct item on the left.

3. What does โ€œDesignโ€ mean?
4. What does โ€œAssemblyโ€ mean?
5. What does โ€œDeadlineโ€ mean?
6. What does โ€œMaterialโ€ mean?
7. What does โ€œUpdateโ€ mean?

Practice more with this lesson:


Your Adblocker is also blocking Videos and Tests on this website.

Please turn off the Adblocker. Thank you.