1. Project
2. Schedule
3. Resources
4. Behind
5. Feedback
Things needed to do work.
Late or delayed.
A planned piece of work.
Information about how well something is done.
A plan of when things happen.
Drag the cards on the right so each lines up with the correct item on the left.