1. Foundation
2. Delay
3. Schedule
4. Materials
5. Timeline
A plan of when tasks will be done.
The base of a building.
A list of events in order of time.
When something happens later than planned.
Things used to build something.
Drag the cards on the right so each lines up with the correct item on the left.