1. Foundation
2. Delay
3. Schedule
4. Materials
5. Timeline
A plan of when tasks will be done.
A list of events in order of time.
The base of a building.
When something happens later than planned.
Things used to build something.
Drag the cards on the right so each lines up with the correct item on the left.