Retrofit, Retrofits, Retrofitted, Retrofitting Quiz Online

Download this quiz as worksheet PDF file

Retrofit, Retrofits, Retrofitted, Retrofitting Quiz Questions

1. The programme made MTR the world's first railway to undertake the _____ of PSDs on a passenger-carrying system already in operation.

A. Retrofitting

B. Retrofits

C. Retrofit

D. Retrofitted

2. A beam, which had been added as part of the seismic _____ project, was found in a cracked condition during a routine inspection in October 2010.

A. Retrofit

B. Retrofits

C. Retrofitted

D. Retrofitting

3. For renovations and _____ they will explore the best options to improve the functionality and efficiency of existing buildings.

A. Retrofit

B. Retrofitted

C. Retrofits

D. Retrofitting

4. Werder Pier was closed to the public in 1996, when Caltrans used it as an equipment staging area for the seismic _____ of the 1967 span.

A. Retrofits

B. Retrofitted

C. Retrofit

D. Retrofitting

5. From early 2015, an extensive overhaul will be carried out by Alstom to the entire fleet to improve passenger conditions, which will include the _____ of full air conditioning, at-seat charging points, provision for wi-fi, and reliability improvements to the doors.

A. Retrofitting

B. Retrofit

C. Retrofitted

D. Retrofits

6. However, the report also stated the pier did not require any seismic _____.

A. Retrofitted

B. Retrofits

C. Retrofit

D. Retrofitting

7. After extensive _____, the MTR system has become, in general, Easy Accessdisabled-friendly—the trains have dedicated blind safely on the platforms, and there are extra wide entry and exit gates for wheelchairs as well.

A. Retrofitted

B. Retrofits

C. Retrofitting

D. Retrofit

8. Passive solar design techniques can be applied most easily to new buildings, but existing buildings can be adapted or "_____".

A. Retrofit

B. Retrofits

C. Retrofitted

D. Retrofitting

9. The laminate can be stuck on to existing windows; this a called a '_____'.

A. Retrofitting

B. Retrofit

C. Retrofits

D. Retrofitted

10. In June 2000, The MTR Corporation proceeded with its plans to _____ 2,960 pairs of platform screen doors at all 30 underground stations on the Kwun Tong Line, Tsuen Wan Line, and Island Line in a six-year programme.

A. Retrofit

B. Retrofitting

C. Retrofits

D. Retrofitted

Retrofit, Retrofits, Retrofitted, Retrofitting Video Quiz

Download this quiz as worksheet PDF file